Starting the calculation
- Select the opt-out scenario and the block available for it.
- Run the simulation.
- Read the expected impact, affected blocks, and recommendations.
- Go to the block on the canvas if you need to fix the topology or add a reserve.
Preparedness checkpoint
The/new/connection-units/verification screen shows separately:
- the presence of a script in the code;
- connection of the contractor for authorized operations of the stand;
- readiness of the allocated stand;
- Live campaign result and proven return to baseline.
