Skip to main content
Start with three questions: is the draft saved, what version is used, and what fresh checks apply to it, editor error, application, and health of the route running should be dealt with separately.

Diagnostic procedure

  1. Open Check and eliminate blocking configuration remarks.
  2. Click Apply changes to, read the plan and reasons for failure.
  3. After application, open Health and run a fresh check with logs.
  4. To recover, go to the Recovery tab and study the pre-check of the selected plan.

Model situations

The rollback loaded, but the route didn’t change

Versions → Roll back restores the picture to a draft. Check it and press Apply changes to. Rollback through a confirmed Flow Guard plan may include an application; read the steps of a specific operation.

Website Unavailable With Healthy Flow

Look at the radar of inaccessible sites, the results of external checks and the actual customer path. Synthetic test is validating its purpose, so its success does not prove the availability of any site, an inaccessible external sample provider also does not prove a route blocking.

Verification

The plan is tested, the expected version is active, there is no incomplete application or recovery, and fresh data and customer verification confirm the desired path.

Rollback

Use the version history of. Before re-acting after a partial failure, find out which steps have already been completed. Check the availability of features in the installed version in the panel; this reconciliation does not confirm the deployment on the servers.